- Before the high-speed knitting machine is turned on, check whether there is any abnormality in each part of the knitting machine server, fill the lubricating parts with lubricating oil as required, carry out an air-opening operation, and wear protective equipment.
- After the wire knot is passed through the guide wheel to the bottom of the flower pot and the electrical conductor is prepared, it is wound on the reel through the traction pulley, and after it is fixed, it is released for use.
- After each shift is parked, the dust, oil stains, and disconnected ends of the wheel slide rail surface, curve groove, left and right spindles, and swing rods should be cleaned in time.
- When the high-speed knitting machine is running, pay attention to observe the equipment, and often check whether the lubricating oil can successfully reach the lubrication point from the pipeline. The rotating parts of the lower arm bracket must be filled with butter and must be filled with butter after every 120 hours of operation.
- As for the operating components of the equipment that cannot be covered by the automatic lubrication system, lubricants should be added manually. Pitch diameter interchangeable gears, telescopic gears, and traction belt gears and racks should be greased once per shift; the polished rods of the cable arrangement should be coated with industrial motor oil several times per shift; At the oil injectors of the seated bearings on both sides of the positive shaft sleeve of the line, oil should be supplied once per shift.
- If an unknown shutdown occurs, it can be cleared according to the alarm flashing light signal generated on the “Fault Alarm” interface; if there is often a shutdown without an alarm at the same time as the oil pump alarm setting time, the oil pump and oil passage should be checked Is everything normal; if it is found that the lubricating oil cannot reach the lubricating point, it must be fault detected before it can be restarted.
- During the operation of the equipment, it is not allowed to replace the hanging wheels. Always pay attention to whether the equipment is running normally. car, ask the maintenance staff to help deal with it and then drive again.
- At the end of the work, disconnect the main power supply, clean the work site, remove the wool and dust on the bottom of the pot, wipe the equipment everywhere, store the remaining hanging wheels in a designated place, place them neatly, and fill in the process card And various forms and records, do a good job in shift work.