What You Need To Know About The Maintenance And Installation Of High-Speed Knitting Machines

Maintenance and inspection contents of high-speed knitting machine:

  1. Check whether the lubricating oil in the main box is within the required standard, take out the oil probe and lower it to ensure that the remaining oil is in the middle of the two lines, but not too much to prevent the lubricating oil from spraying out.
  2. Check the lubricating oil of the stepless speed-regulating motor, which can be estimated by the oil mirror. When it is less than half of the oil mirror, the lubricating oil should be filled.
  3. All gear shaft parts of the machine should be properly lubricated and maintained once a week.
  4. The polished rod part of the polished rod cable arrangement should be properly lubricated and maintained once a week.
  5. Make sure there are no obstacles within the device position range and check anytime and anywhere.
  6. Tighten the screws of the machine’s transmission system and connecting parts to prevent loosening from affecting the operation of the machine, and check it once a week.
  7. Before the actual operation of the machine, run it at a low speed for about 5 minutes and then increase the speed.

Maintenance countermeasures for standard parts of high-speed braiding machines:

  1. Use inspection to see if the key process components and tightening joints of each piece of equipment are loose, and tighten loose parts in time.
  2. Purchase standard tightening connectors from designated factories in my country, and build a safety inspection system with inspection as the key
  3. Unify the tightening operation steps of standard parts to minimize the under-tightening or over-tightening, which may lead to potential failures or reduce the service life of tightened parts.

Five points must be understood when installing the high-speed knitting machine as a whole.

  1. Before installation, use a rag soaked in diesel or gasoline to remove protective materials and debris from the machined surface, and be careful not to drop gasoline and gasoline on the painted surface. Then wipe with a clean cloth, And apply to clean up the car oil to prevent rust.
  2. For the anchor screws on the concrete base, shallow holes must be used, and the basic depth depends on the local geological conditions. On the roof of the concrete, through holes are used. The base must be strong to prevent vibration when the knitting machine is working.
  3. During installation, it can be adjusted with a wedge iron and a level can be used to find the alignment. For a braiding machine with a relatively large specification and model, where the weaving part and the traction belt part are split bases, for the convenience of adjustment, the weaving part of the foot can be adjusted with pad iron, and the traction belt part can be adjusted. Adjustable feet are optional and can be calibrated with a level.
  4. When installed as a whole, the flatness dimensional tolerance of the base is ≦1.0MM/M. The coaxial axial dimension tolerance of the knitting machine with a split base ≤∮4mm along the axis of the knitting part of the movement track.
  5. After the braiding machine is calibrated, the secondary grouting is completed.