Operating Standards And Installation Procedures For High-Speed Braiding Machines

Operating standards for high-speed knitting machines.

  1. The equipment of the high-speed knitting machine stops suddenly during the weaving process. The equipment of the high-speed belt knitting machine suddenly stops during the weaving process.
  2. The shielding layer of the high-speed braiding machine does not meet the requirements and standards When you’re done, go back to braiding.
  3. The high-speed braiding machine should strictly implement the quality management regulations in the weaving process, carry out production and manufacturing, strictly implement the process card requirements issued by the company to the equipment of the fast rope braiding machine production workshop, control the process parameters, and make good inspection records.
  4. The clipping mark of the high-speed braiding machine cable In the working stage of the fast rope braiding machine, a complete wire reel requires one end. If there is a connector inside that needs to be broken, the reason must be marked in the middle of the mark and noted. The length of the first half of tomorrow.

The overall installation process of the knitting machine.

The knitting machine is generally packaged and shipped as a whole. After the new mobile phone enters the factory, the foundation is prepared in advance according to the foundation diagram and related technical documents for easy installation. The overall installation should pay attention to the following aspects.

  • Before installation, use a rag soaked in diesel or gasoline to remove protective materials and debris from the machined surface, and be careful not to drop gasoline and gasoline on the painted surface. Then wipe with a clean cloth, and apply it to clean up the car oil to prevent rust.
  • For the anchor screws on the concrete foundation, it is necessary to use shallow holes, and the depth of the foundation depends on the local geological environment. For the concrete on the roof, use through holes. The foundation must be strong to prevent vibration when the knitting machine is working.
  • During installation, it can be adjusted with a wedge iron, and a level is aligned. For a braiding machine with a relatively large specification and model, where the weaving part and the traction belt part are split bases, for the convenience of adjustment, the weaving part of the foot can be adjusted with a pad iron, and the traction belt part can be adjusted. Adjustable with adjustable feet and calibrated with a spirit level.
  • During the overall installation, the flatness dimension tolerance of the base is ≦1.0MM/M. For the knitting machine with a split base, the coaxial axial dimension tolerance of the weaving part of the movement track axis is ≤∮4mm.
  • After the braiding machine is calibrated, the secondary grouting is completed.
Facebook
Twitter
WhatsApp
LinkedIn