  1. Before opening the high-speed braiding machine, check whether there are any abnormalities in the components of the braiding machine server. Fill each lubricating part with lubricating oil as required, perform an air-open operation, and wear protective equipment.
  2. After the wire is tied through the guide wheel to the bottom of the flower pot and the braided conductor, it is then put on the take-up reel through the traction wheel, and after being fixed, the driving is started.
  3. When parking for each shift, the dust, oil stains, and broken joints on the wheel slide rail surface, curve groove, left and right spindles and swing rods must be cleaned promptly.
  4. When the high-speed knitting machine is running, pay attention to observing the machinery and equipment, and frequently check whether the lubricating oil can smoothly reach the lubrication point from the pipeline. The rotating component of the lower swing arm support frame must be filled with unsalted butter, and it must be filled with unsalted butter after every 120 hours of operation.
  5. All operating components of the equipment that cannot be touched by the automatic lubrication system must be lubricated manually on a regular basis. The pitch diameter interchangeable gears, telescopic gears, and traction belt gear rack parts should be added with industrial grease once per shift; the main rod of the cable arranger should be filled with industrial engine oil several times per shift; the main rod of the cable arranger should be filled with industrial engine oil And the oil injectors of the spherical bearings at both ends of the winding positive transmission gear should be oiled once per shift.
  6. If there is an unknown shutdown, you can clear it accordingly based on the alarm flashing light signal generated on the “Fault Alarm” interface; if there are frequent shutdowns without an alarm system at the same time as the oil pump alarm setting time, you should check the oil pump and oil passage. No problem; if it is found that the lubricating oil cannot reach the lubrication point, fault detection is required before restarting.
  7. During the operation of the equipment, it is not allowed to replace the hanging wheels. Always pay attention to whether there are any problems in the operation of the equipment. Operators are not allowed to leave their posts without authorization or let people without work certificates operate. If there is an abnormality in the equipment, they need to stop in time. Ask the maintenance staff to help you deal with it, and then drive again.
  8. After the work is completed, cut off the main power supply, clean the construction site, remove the lint and dust in the bottom of the flower pot, clean all parts of the equipment, store the remaining hanging wheels in a designated place, place them properly, fill in the process card and all other Forms and records, do a good job in handover work.